Labor property development

Nutzungskonzept

UTILIZATION STUDIES

01
PROJECT DATA

location: former Alpine Areal, Salzburg Wals Siezenheim
client: Bilfinger Industrietechnik
useable floor area: 27.000m2
status: feasibility study
project team: Alexander Matl, Thomas Buseck

02
Projektbeschreibung

By thoroughly analyzing the site as well as surrounding areas, we are able to study structural versions and rate them using a utilization study. This includes, for example, the rating of lots based on their location, infrastructural accessibility and possible transport connections.

Privacy Notes